ParaQ:Telecon 11/08/2005 1PM EST: Difference between revisions

From ParaQ Wiki
Jump to navigationJump to search
 
Line 18: Line 18:
|-
|-
| 3
| 3
| Rogers/Wylie
| Demo script re-evaluation.  Focus on quantitative capabilites.
|-
|-
| 4
| Shead/McBride
| Shead/McBride
| ParaQ v1.0 update: Code evaluation and migration complete.
| ParaQ v1.0 update: Code evaluation and migration complete.  Update on Undo/Redo.  Update on Testing (Testing level 1 complete when ...).  Determine plan for moving forward with client side graphing.
|-
|-
|-
|-
| 4
| 5
| Shead
| Shead
| Undo/Redo design update ( see [[Undo Design]] )
| Undo/Redo design update ( see [[Undo Design]] )
|-
|-
|-
|-
| 5
| 6
| Rogers
| Rogers
| Compound filter discussion ( see [[ParaQ:Compound Filter Design]] )
| Preliminary Compound Filter discussion ( see [[ParaQ:Compound Filter Design]] )
|-
|-
|}
|}

Latest revision as of 08:56, 8 November 2005

Agenda

Item People Description
1 Rogers Overivew of today's meeting
2 Berk Multiview update: check-in scheduled
3 Rogers/Wylie Demo script re-evaluation. Focus on quantitative capabilites.
4 Shead/McBride ParaQ v1.0 update: Code evaluation and migration complete. Update on Undo/Redo. Update on Testing (Testing level 1 complete when ...). Determine plan for moving forward with client side graphing.
5 Shead Undo/Redo design update ( see Undo Design )
6 Rogers Preliminary Compound Filter discussion ( see ParaQ:Compound Filter Design )