Monthly Build Goals: Difference between revisions

From ParaQ Wiki
Jump to navigationJump to search
Line 54: Line 54:
! DR
! DR
|
|
| Action Items should be put into bug tracker
| Action Items should be put into bug tracker.  Make sure that all people are in bug tracker.
|-
|-
|}
|}

Revision as of 13:47, 15 March 2006

March (release date Friday, March 31)

Initial executable release, not intended to be released to users. This is a chance for us to get our repository ready for full-on development, and get Testing, Coverage, and Testplans in place.

Action Items

Item Who Status Desc.
001 BG Reformat repository
002 BG Doxygen operates on entire repository
003 BG Code properly commented (so Doxgen works on the entire repository
004 BG Dashboard is green. BG will pursue miscreants and ne'er-do-wells
005 BG Adequate code coverage
006 MR Auto-generated object inspectors should be improved. In particular, useful widgets when possible, and the most eye-pleasing design possible. A general goal is that the automatically-generated object inspectors should be as well-designed, useful, and pleasing to the eye as possible.
007 ETI/TS Demo-specific code removed
008 DR Action Items should be put into bug tracker. Make sure that all people are in bug tracker.

April (release date Friday, April 28th)

  • Full support for building pipelines, including:
    • 3D widgets
    • Pipeline editor with fan-out support (user can easily understand connections, types of objects, state of those objects)
    • Undo/Redo on all operations
  • File->Open, File->Save, File-Save As, File->New all need to work.
  • Initial Release Test Plan, captured in a recorded test.