ITK/Tcons/Agendas/2011 09 09: Difference between revisions
From KitwarePublic
Jump to navigationJump to search
Agouaillard (talk | contribs) |
|||
(3 intermediate revisions by 3 users not shown) | |||
Line 12: | Line 12: | ||
* Meeting link | * Meeting link | ||
* https://emeetings.webex.com/emeetings/ | * https://emeetings.webex.com/emeetings/j.php?ED=138191182&UID=482060457&PW=NNzJiNDk1ZGU3 | ||
= Project Management = | = Project Management = | ||
Line 18: | Line 18: | ||
* Developers Meeting September 27-28-29 | * Developers Meeting September 27-28-29 | ||
** NLM | ** NLM | ||
** [[Fall_ITKv4_2011_Meeting|Wiki Page]] | |||
== <span style="background:#FF0000"> THE END IS HERE !! </span> == | == <span style="background:#FF0000"> THE END IS HERE !! </span> == | ||
Line 68: | Line 68: | ||
=== DICOM === | === DICOM === | ||
* New roadmap and deliverable to be decided by Alex/steve/STephen: [http://www.vtk.org/Wiki/ITK_Release_4/DICOM/Meeting_2011.09.01_Roadmap | here ] | |||
* New roadmap and deliverable to be decided by Alex/steve/STephen | |||
=== GPU === | === GPU === | ||
Line 128: | Line 121: | ||
** Barracuda | ** Barracuda | ||
** Clownfish | ** Clownfish | ||
* Hooperlab | * Hooperlab | ||
** Bubbles | ** Bubbles |
Latest revision as of 14:10, 9 September 2011
How to Join the Tcon
Number to Call
Please be patient, due to some unforeseen circumstances, the call may not start on time...
- 1-800-728-9607 (in the US) or
- +1 9139049873 (international)
- access code 6815251
Webex
- Meeting link
- https://emeetings.webex.com/emeetings/j.php?ED=138191182&UID=482060457&PW=NNzJiNDk1ZGU3
Project Management
- Developers Meeting September 27-28-29
- NLM
- Wiki Page
THE END IS HERE !!
- Closing on Beta Release
- Test, Fix, Merge, or Die !
- FREEZING TODAY FRIDAY SEPTEMBER 9th 2011
FEM
- Done to Beta Level
- Need to review code coverage
Level Sets
- Merged Gerrit Patch
- 2526
- And a collection of JIRA tickets
- Done to Beta Level
- Need to review code coverage
- MICCAI Tutorial
- Provide a couple of examples
Registration
- Merged
- High Dimensional Optimizers
- Gerrit 2569
- High Dimensional Optimizers
- Transform Patch
- Remaining JIRA Tickets (~10)
- MICCAI Tutorial
- Tests / Examples ?
Simple ITK
- Image Buffer Access
- Packaging
- MICCAI Tutorial
- Web pages are up
- http://www.kitware.com/SimpleITK/project/project.html
- Need some retouches (soon...)
WrapITK
- packaging being sync'ed with simpleITK (python currently)
- Next: finish wrapitk integration
- Next(2): C#
- infrastructure: set up a robot build with wrapping (mac)
DICOM
- New roadmap and deliverable to be decided by Alex/steve/STephen: | here
GPU
- Status ?
- Mac Compilation
- Scope of filters to support ?
- Patch added today
TIFF Update
- Pending warning about 3Gb computation in Windows.
- Need verification when saving images larger than 9Gb.
Numerical Libraries
- Julie Langou Visting Kitware for a Week-long Hackathon.
- Refactor Numerical Libraries
- Avoiding FORTRAN to C translation
- Removing "eispack and "linpack" to be replaced with "lapack" calls
- provide "lapack" through "lapacke"
- Immediate Targets
- FFT
- Linear Solvers for large sparse matrices (for FEM)
A2D2 Microscopy Colocalization
- Started Gerrit training: Two Hackathons
- Patches coming into Gerrit
A2D2 on Registration Optimization
- Did Gerrit training: One hackathon
Video Bridge
- Patch in Gerrit
- http://review.source.kitware.com/#change,2733
Dashboard
- New Stronger Warning Settings
- Problem: Hyper-Abundance of Warnings is killing the CDash Server.
- Proposal: Activate the warning on selected modules and clean house-by-house...
- This divide-and-conquer method proved to be successful when cleaning KWStyle issues.
Missing Builds
- Harvard
- Barracuda
- Clownfish
- Hooperlab
- Bubbles
- Kitware
- Amber12
Bug fix release
- ITK 3.20.1
- Fix Win64 Visual Studio compile issues
- Fix GCC 4.6 issues
- Pending patch on ImageIO issue raised by Slicer.
- Bill Lorensen will look at it and potentially put a Gerrit patch.
- Stable release for Slicer to build against
- ITK First: Hold ground on quality control
Schedule
- Transition Plan
- ITKv4 Alpha-09 Tagged
BETA RELEASE
- New Date : September 15th
- SCRUM Process
- Tools: (demo) https://itk.icts.uiowa.edu/jira/secure/Dashboard.jspa
- Five Sprints (two weeks each).
- Two Sprints Left.
- Five Sprints (two weeks each).
- Tools: (demo) https://itk.icts.uiowa.edu/jira/secure/Dashboard.jspa