Project Management
THE END IS NEAR !
- Closing on Beta Release
- Test, Fix, Merge, or Die !
FEM
- Memory leaks pending
- Create Instance bug
- Suggestion to remove the Register call from this method.
- Create Instance bug
Level Sets
- Gerrit patch
Registration
- Transform Patch
- MICCAI Tutorial
Simple ITK
- Image Buffer Access
- Packaging
- MICCAI Tutorial
WrapITK
- ITK-2528 is trivial to close now (wrapitk modules = itk modules)
- ITK-255 has been waiting for reviews for a week
- SUpport for 64bits type ongoing (Unsigned long => SizeValueType/IdentifierType)
- New nightly up and running (Karoshi2, WRAPITK), continuous on the way (Karoshi)
DICOM
- Many small bug fixes and stability improvement
- ITK-262 (fix warnings in gdcmDataSet)
- ITK-279 (m_FrameOfReferenceInstanceUID is generated but not saved in Code/IO/itkGDCMImageIO.cxx)
- ITK-288 (Missing size checking in itkGDCMImageIO::Write when using GDCM 2.0)
- ITK-235 (GDCMTargets.cmake is not installed)
- need to reproduce the zSpacing problem: ITK-182 (brad?)
- Big tickets started and ready for next sprint ( RT, Stream and PACS in order )
- New nightly up and running (Karoshi2, GDCM-PROPER and GDCM-FORK), continuous on the way (Karoshi)
GPU
- Status ?
Bug fix release
- ITK 3.20.1
- Fix Win64 Visual Studio compile issues
- Fix GCC 4.6 issues
- Pending patch on ImageIO issue raised by Slicer.
- Bill Lorensen will look at it and potentially put a Gerrit patch.
- Stable release for Slicer to build against
- ITK First: Hold ground on quality control
Schedule
- Transition Plan
- ITKv4 Alpha-09 Tagged
BETA RELEASE
- New Date : September 15th
- SCRUM Process
- Tools: (demo) https://itk.icts.uiowa.edu/jira/secure/Dashboard.jspa
- Five Sprints (two weeks each).
- Three Sprints Left.
- Five Sprints (two weeks each).
- Tools: (demo) https://itk.icts.uiowa.edu/jira/secure/Dashboard.jspa