ParaView 3 Telecon 05/22/2007

From ParaQ Wiki
Jump to navigationJump to search
Item People Description
1 All ParaView 3.2 Deliverables Progress
2 All Open level 4 bugs
3 Moreland Resolved bugs
4 Moreland Animation GUI
5 All Summit Prep

Deliverables

Testing (Clint/Amy/Shawn)

Clint: I'm still working on increasing coverage. And fixing bugs and build issues in 3.0 between coverage results. We're up to about 55% from about 48%. On the GUI side, coverage is lacking for new GUI code, Chart code, and a few other minor features. I plan to cover the Chart code with C++ unit tests. I could wrap up the GUI side this week. There are a significant number of non-GUI classes without coverage that keep the percentage low. What percentage are we shooting for? ParaView 2 has about 58%.

Display Rearchitecture (Utkarsh)

Still ongoing.

Multiblock (Dave D.)

Dave is on travel.

Exodus (Eric)

Started a Wiki page on fast-path temporal plotting option.

Working on the Exodus writer to be able to write all time steps.

Animation (Clint/Utkarsh)

Not started.

Selection (Dave D.)

Dave is still on travel.

Annotation (Yumin)

Yumin is working with Utkarsh on the representation/view stuff.

Spreadsheet View (Utkarsh/Berk)

Probably will not be started until the representation/view rearchitecture.

Charts (Mark)

Mark is still not in.

Support for Multiple Output (Berk)

Berk spent 1 hour on it. Ongoing.

Summit

  • Go over software methodology to make sure we are on track.