ParaView 3 Telecon 05/22/2007: Difference between revisions
No edit summary |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 30: | Line 30: | ||
=== Display Rearchitecture (Utkarsh) === | === Display Rearchitecture (Utkarsh) === | ||
Still ongoing. | |||
=== Multiblock (Dave D.) === | === Multiblock (Dave D.) === | ||
Dave is on travel. | |||
=== Exodus (Eric) === | === Exodus (Eric) === | ||
Started a Wiki page on fast-path temporal plotting option. | |||
Working on the Exodus writer to be able to write all time steps. | |||
=== Animation (Clint/Utkarsh) === | === Animation (Clint/Utkarsh) === | ||
Not started. | |||
=== Selection (Dave D.) === | === Selection (Dave D.) === | ||
Dave is still on travel. | |||
=== Annotation (Yumin) === | === Annotation (Yumin) === | ||
Yumin is working with Utkarsh on the representation/view stuff. | |||
=== Spreadsheet View (Utkarsh/Berk) === | === Spreadsheet View (Utkarsh/Berk) === | ||
Probably will not be started until the representation/view rearchitecture. | |||
=== Charts (Mark) === | === Charts (Mark) === | ||
Mark is still not in. | |||
=== Support for Multiple Output (Berk) === | === Support for Multiple Output (Berk) === | ||
Berk spent 1 hour on it. Ongoing. | |||
== Summit == | |||
* Go over software methodology to make sure we are on track. |
Latest revision as of 12:53, 22 May 2007
Item | People | Description |
---|---|---|
1 | All | ParaView 3.2 Deliverables Progress |
2 | All | Open level 4 bugs |
3 | Moreland | Resolved bugs |
4 | Moreland | Animation GUI |
5 | All | Summit Prep |
Deliverables
Testing (Clint/Amy/Shawn)
Clint: I'm still working on increasing coverage. And fixing bugs and build issues in 3.0 between coverage results. We're up to about 55% from about 48%. On the GUI side, coverage is lacking for new GUI code, Chart code, and a few other minor features. I plan to cover the Chart code with C++ unit tests. I could wrap up the GUI side this week. There are a significant number of non-GUI classes without coverage that keep the percentage low. What percentage are we shooting for? ParaView 2 has about 58%.
Display Rearchitecture (Utkarsh)
Still ongoing.
Multiblock (Dave D.)
Dave is on travel.
Exodus (Eric)
Started a Wiki page on fast-path temporal plotting option.
Working on the Exodus writer to be able to write all time steps.
Animation (Clint/Utkarsh)
Not started.
Selection (Dave D.)
Dave is still on travel.
Annotation (Yumin)
Yumin is working with Utkarsh on the representation/view stuff.
Spreadsheet View (Utkarsh/Berk)
Probably will not be started until the representation/view rearchitecture.
Charts (Mark)
Mark is still not in.
Support for Multiple Output (Berk)
Berk spent 1 hour on it. Ongoing.
Summit
- Go over software methodology to make sure we are on track.